Asbestos Abatement Software
Asbestos abatement takeoff and estimating, from the survey to the bid
An abatement bid starts with the asbestos survey and ends with a manifest. In between sit the ACM quantities, the containment that makes the work legal, the air monitoring that proves it, and the disposal that closes it out. Demotek keeps all of it on one project, with the plans, the specs and the survey side by side.
Why abatement bids go wrong
Most abatement estimates live in a spreadsheet beside a PDF of the survey. The quantities are retyped from the report, containment and air monitoring are guessed as a percentage, and the abatement number is copied into the demolition bid by hand. When the survey changes or a material is missed, nothing updates. An abatement estimate is only as good as the line between each material on the survey and the cost it carries.
Takeoff by material
Measure ACM the way the survey states it: one material at one location with its quantity. Areas for flooring and ceilings, linear feet for pipe insulation, counts for fittings, each tied to where it sits on the plans.
Containment and compliance priced, not guessed
Each abatement scope carries its containment, negative-air units, decon, air monitoring and clearance as costs attached to the quantity, so the compliance cost moves when the quantity does.
Specs and surveys read for you
The AI scope scan reads the spec book’s abatement and demolition sections in full, and the survey report’s materials with the quantities it states, and lists the abatement work it finds, so a hazardous-material note in Division 02 does not slip past the bid.
Manifested disposal
Price asbestos waste per unit by destination, beside the demolition debris, so licensed disposal is a line in the bid instead of an afterthought.
Abatement and demolition in one project
Contractors who self-perform both carry the abatement phase and the demolition phase in the same project, on the same plan set, with the clearance between them. If abatement goes to a sub, carry the sub’s number as its own trade on your demolition bid instead of retyping it.
Flag it on the walkthrough
On the site walk, drop an asbestos pin on the plan with a photo where you see suspect material. The flag rides into the estimate as hazardous material the office must price or exclude, so it never lives only in someone’s notes.
Field work after the bid
Once the job is won, crews clock in from the field, file their daily logs and safety forms, and sign their day from the iPhone and iPad apps, on the same project the abatement was priced in.
Frequently asked
Common questions.
Is Demotek asbestos abatement software or demolition software?
Both. Demotek is built for demolition and asbestos abatement contractors. Abatement is its own project type and its own scope kind, with ACM takeoff, containment, air monitoring and manifested disposal, and it can share a project with the demolition that follows it.
Can I take off quantities straight from an asbestos survey?
Yes. Enter each positive material the survey lists at its location and quantity, then measure or check the quantity on the plans. Every abatement line traces back to a material on the survey.
Does Demotek use AI for asbestos abatement?
Yes. The AI scope scan reads the project specs and drawings and lists the abatement and hazardous-material work it finds, and the AI assistant answers questions about the job from its documents. An estimator reviews everything the AI proposes before it reaches a bid.
Does it price containment and air monitoring?
Yes. Containment, negative-air units, decontamination, air monitoring and clearance are priced as costs attached to each abatement scope, not folded into overhead.