Demolition Project Management

Demolition project management that starts at the bid

Most demolition project management tools begin after you have already won the job — and treat the estimate as an attachment. Demotek keeps the whole project on one thread, from the takeoff that priced the bid to the crew clocking in on site.

Why demolition projects drift

A demolition project usually lives in three places at once: the estimate in Bluebeam and Excel, the schedule in a management tool, and the actual costs in accounting. Nobody can draw a straight line from what you bid to what the job is costing today, so overruns surface only after the job is over. Managing a demolition project well starts with keeping the estimate and the execution in the same system.

One project, one thread

Takeoff, estimate, scope, crews, disposal, proposal, and field logs all hang off the same project — not scattered across separate tools that never reconcile.

Scope and crew libraries

Reuse the demo scopes and crew compositions you bid over and over. Encode a scope once and every future project inherits it, so a small team runs more jobs without more estimators.

Disposal and logistics built in

Dump-site routing, dumpster sizing, and tipping fees are part of the project plan, not a spreadsheet bolted on the side.

Field-to-office in real time

Crews clock in from the field, forms file themselves at the start and end of the day, and dumpster and equipment requests land on the office dispatch board without a phone call.

Built for demolition, not adapted to it

General construction project management software is built for trades that add material and can be bent to fit demolition with enough configuration. Demotek is built the other way — selective vs. structural sequencing, salvage credits, disposal streams, and abatement are first-class, because the whole product is for demolition and abatement contractors.

The estimate is the plan

When the estimate lives inside the project, the project plan is already priced. Crews, equipment, disposal, and schedule all trace back to line items you bid, so a change in the field updates the number the office is managing against instead of quietly diverging from it.

Frequently asked

Common questions.

Is this a replacement for my estimating tool?

Yes — Demotek includes on-screen takeoff and demolition estimating, so the project starts with the bid instead of importing it. Most contractors replace a Bluebeam-plus-Excel estimating workflow and a separate management tool with one platform.

Can foremen use it in the field?

Yes. Crews clock in and out, sign their day, and file compliance forms from a mobile field app, and foremen call in dumpsters and equipment to the office from the same app.

Does it handle asbestos abatement projects?

Yes. Abatement scopes and the sequencing between abatement and demolition are handled natively for contractors who self-perform both.

Wire up your first bid

Ready to bidsmarter?

See Demotek in action - a 30-minute walkthrough with our team, tailored to the way your crew bids work. No commitment, no pressure.

Demotek logo

DEMOTEK

Modern takeoff and estimating built for demolition contractors. Bid faster, win more, and run your team off one source of truth.

Operational