About Demotek
Built by demo people,for demo people.
Demotek is estimating and takeoff software built for demolition contractors. We're replacing the Bluebeam + Excel workflow with one workspace that knows what selective vs. structural means, how a haul cycle actually prices, and why a foreman's production rate matters more than a textbook's.
The story
Demotek started because the existing tools for demolition estimating are all retrofitted from somewhere else. Bluebeam is a PDF tool that grew a measure feature. PlanSwift is a framing estimator. STACK is general-purpose construction takeoff. None of them know that a disposal site has a tipping rate, that a sawcut perimeter prices differently from a slab area, that a CMU partition is a different production rate from drywall on metal stud.
We thought a tool built for demolition from day one — selective vs. structural overlays on the same plan, scope assemblies owned by the crew leads who actually do the work, disposal routing baked into the estimate, salvage credits as real line items — would shrink the takeoff-to-proposal loop from days to hours. So far it has.
The plan
Demotek is a small, focused team. Every estimator and crew lead we talk to shapes the next thing we build — what circuits get added to the library, which crew templates ship in the next release, what the proposal output looks like. The roadmap is set by demolition contractors, not by software people.
If you're a demolition contractor and you have an opinion about how the workflow should work, we want to hear it. The fastest way is a 30-minute walkthrough — we'll run your bid through the tool, and you'll tell us what's wrong with it.
The writing
We write at demotek.com/blog about estimating, takeoff, scope assemblies, crew planning, and disposal routing. The articles are aimed at working demolition estimators, not software buyers — we care about the part of your job that actually takes time.
Recent writing.
How to Estimate Demolition Cost per Square Foot (the Method)
A per-square-foot number is easy to ask for and hard to defend. Here is the method for producing your own from quantities and closed jobs, and where it belongs in the bid.
Demolition Bid Checklist: Exclusions and Clarifications That Protect Your Margin
The qualifications page decides who pays when the building turns out different from the drawings. Here is a checklist of the exclusions and clarifications that matter most.
Demolition Debris Weight: Tons per Cubic Yard by Material
A conversion table for demolition debris: tons per cubic yard in place and loose, swell factors, and slab weight by thickness, with a worked example and the mistakes to avoid.
Roll-Off Dumpsters and Haul-Off Planning for Demolition Bids
Haul-off is where good labor numbers go to die. Here is how to count cans and loads from the takeoff, pick trucks or cans, and price every haul-off cost on its own line.
Concrete Slab and Foundation Demolition Estimating: A Practical Guide
A slab looks like one area on the plan. Priced properly it is area, thickness, sawcut, footings, tons, and loads. Here is the order to build it in.
Bring us your worst bid.
Pick the plan set that took your shop the longest to estimate last quarter. We'll run it through Demotek live and show you what changes.