Abatement
The licensed removal, encapsulation, or enclosure of asbestos-containing material.
- Abatement is the controlled handling of asbestos-containing material (ACM) so it can be removed or made safe without releasing fibers. On a building slated for demolition, abatement is the first phase — the ACM comes out under containment and the area passes clearance before structural demolition can legally begin. An abatement estimate prices removal labor, containment, air monitoring, and manifested disposal together.
ACM (Asbestos-Containing Material)
Any material an asbestos survey confirms contains asbestos above the regulated threshold.
- ACM is the material an abatement bid is built around — floor tile and mastic, sprayed-on fireproofing, transite panels, roofing felts, and thermal system insulation. The asbestos survey identifies which materials are positive and whether each is friable; the takeoff measures how much of each there is. ACM is tagged by material on the takeoff because production rate and disposal class differ between, say, friable pipe insulation and non-friable floor tile.
Air Monitoring
Sampling of airborne fibers before, during, and after abatement to prove the work is controlled.
- Air monitoring brackets every abatement job — background sampling before, periodic sampling during, and final clearance sampling after. It is usually a third-party industrial-hygiene cost and a real schedule dependency: the next trade cannot start until clearance passes. Price monitoring as its own line, per containment area, so a failed clearance and re-clean is a visible change rather than a silent margin leak.
Area Takeoff
A measurement in square feet of a region on the plan.
- An area takeoff is a polygon drawn on the plan that captures square footage — typically slabs, floor finishes, walls by area, or roof surfaces. Area takeoffs feed scope assemblies that price per SF, so the tag on the takeoff determines which assembly applies.
Bid Sheet
The line-item summary of the estimate, used internally and on the proposal.
- A bid sheet is the line-item breakdown of a demolition estimate — each scope, with its quantity, unit price, and extended total. It is the working artifact estimators iterate on before generating the proposal that ships to the client.
Calibration
Setting the pixels-per-foot ratio so on-screen measurements convert to real-world units.
- Calibration is the most leveraged step in any on-screen takeoff. You pick a known dimension on the plan (a wall labeled "10'-0""), click each end, and type the real-world length. The tool computes the pixels-per-foot ratio and applies it to every measurement on that sheet after. Get this wrong by a factor of two and every quantity is wrong by a factor of two.
Circuit (Scope Assembly)
A reusable recipe mapping a takeoff quantity to labor, equipment, disposal, and salvage.
- A circuit (also called a scope assembly or template) is a saved recipe that maps a single takeoff quantity onto everything needed to execute and dispose of that scope. Built once by the crew lead who owns the work, applied every bid by every estimator. The single biggest accuracy lever in any demolition bid shop.
Clearance
The final air sampling that must pass before a containment comes down.
- Clearance is the final air sample taken inside a containment after cleaning. Until it passes, the enclosure stays up and no follow-on work — including demolition — can begin. A failed clearance means re-cleaning and re-sampling on the contractor’s clock, so the clearance gate is both a cost line and a schedule dependency between the abatement phase and whatever comes next.
Containment
The negative-pressure enclosure that keeps asbestos fibers inside the work area.
- Containment is the sealed, negative-pressure enclosure built around friable abatement work — poly on every surface, HEPA-filtered negative-air units sized to the room volume, and decontamination chambers. It is a measurable scope, not overhead: enclosure area in SF, negative-air units as a count driven by volume and air changes, and decon as an assembly with its own labor and materials. Forgetting to price containment is the most common way an abatement bid goes wrong.
Count Takeoff
A discrete count of items — doors, fixtures, columns, equipment.
- A count takeoff is the simplest measurement type. Click each item to be demolished, salvaged, or disconnected. The trap is consistency: if "door" sometimes means a door slab and sometimes door-plus-frame-plus-hardware, the bid will argue with itself. Tag every count with what it actually includes.
Cycle Time
The round-trip duration of a truck from job site to disposal and back.
- A truck cycle is load + drive to destination + tip + return drive. For a 30-mile haul on suburban roads, a typical cycle is 90-120 minutes. The cycle determines how many loads a truck can do in a day, which determines how many truck-days a job needs to haul its debris. Pricing the cycle wrong is the most common way disposal blows a budget.
Demolition Assembly
See: Circuit.
- See Circuit. "Demolition assembly," "scope assembly," and "circuit" all refer to the same reusable recipe mapping a takeoff quantity onto labor, equipment, materials, and disposal.
Encapsulation
Sealing ACM in place with a bonding agent instead of removing it.
- Encapsulation treats asbestos-containing material with a bonding agent so its fibers stay locked in place — an alternative to removal when the material is intact and can be left undisturbed. It prices per SF or LF of treated surface and is a different scope from removal: no manifested waste stream, but ongoing management obligations. The estimate should carry encapsulation and removal as distinct scopes, never blended.
Estimate
The shop-internal pricing document derived from the takeoff.
- An estimate is the pricing document that lives inside the estimating shop — every line item, with quantities, rates, and costs. It is the source of truth for the bid sheet and the proposal. In a modern tool, the estimate is the live result of applying scope assemblies to the takeoff.
Friable / Non-Friable
Whether ACM can be crumbled by hand — the property that drives method, rate, and risk.
- Friable ACM can be reduced to powder by hand pressure (sprayed fireproofing, thermal system insulation) and releases fibers easily, so it demands full containment and the slowest, most expensive removal. Non-friable ACM (floor tile, intact transite) binds the fibers and can often be removed with less aggressive controls. The survey flags friability per material, and the takeoff tags it, because it changes both the production rate and the disposal class.
Glovebag
A sealed bag used to remove ACM from a single pipe fitting or small run.
- A glovebag is a disposable, sealed enclosure fitted around a pipe so insulation can be stripped from a fitting without a full room containment. Each elbow, tee, and valve on a thermal-system-insulation run is a separate glovebag operation, which is why fittings are counted individually on the takeoff — the fitting count, not the linear footage alone, drives the labor on TSI removal.
Hardfill
A disposal destination for clean inert debris — brick, block, broken concrete.
- A hardfill site accepts clean inert demolition debris (concrete chunks, broken brick, certain soils) for use as fill in land reclamation or grading. Tipping at hardfill is usually cheap or free; sites tend to be near active construction zones, so haul cycles are short. Routing concrete and inert debris to hardfill (rather than landfill) is one of the easiest disposal savings on a structural job.
Haul Cycle
See: Cycle Time.
- See Cycle Time. The two terms are used interchangeably in disposal pricing.
Linear Takeoff
A measurement in linear feet — partitions, sawcuts, fences, curbs.
- A linear takeoff captures anything that prices per foot. The most common is interior partition demolition (LF of drywall on metal stud, LF of CMU). Sawcut LF is often missed — every slab section that needs to come out has a sawcut perimeter that should be priced separately from the slab area itself.
Negative-Air Unit
A HEPA-filtered machine that holds a containment under negative pressure.
- A negative-air unit (or air scrubber) pulls air out of a containment through a HEPA filter, keeping the enclosure under negative pressure so fibers cannot escape. The number of units is a count driven by the room volume and the required air changes per hour; each carries rental days plus filter consumables. On the takeoff, negative-air units come off the same plan as the enclosure area they serve.
NESHAP
The federal air-quality rule that governs asbestos work and demolition notifications.
- NESHAP (the National Emission Standards for Hazardous Air Pollutants) sets the asbestos rules that bracket a job: notification to the regulator before demolition or renovation that disturbs a regulated quantity of friable ACM, work-practice standards during, and disposal requirements after. The notification has a required lead time, which makes it a real schedule input — demolition cannot mobilize until both clearance passes and the notification window has run.
Production Rate
How fast a crew or piece of equipment completes a unit of work.
- Production rate is the workhorse of demolition estimating — laborer-hours per LF of partition demolition, machine-days per square foot of slab demolition, tons per machine-day on a structural takedown. The foreman who has actually done the work owns the real rates; the estimator who has not is guessing. Encoding production rates into circuits is how the foreman's knowledge compounds across every bid.
Proposal
The client-facing document derived from the estimate.
- The proposal is what the client actually signs. It is generated from the estimate, branded with the shop's identity, and structured so the client can react to it. In a modern tool, the proposal is a one-click export from the estimate — no rekeying, no formatting drift between bids.
Salvage Credit
A buyback line item that offsets demolition cost — scrap steel, copper, brass, recoverable equipment.
- A salvage credit is real revenue from material the demolition crew recovers and sells. Scrap steel from a structural takedown, copper wire and brass fixtures from a selective interior, recoverable HVAC equipment with a used-equipment market. The estimate should price each salvage line as a specific quantity at a confirmed buyback rate, not as a fudge factor.
Sawcut
A linear cut through slab or pavement to define the demolition perimeter.
- A sawcut is a linear saw pass through concrete slab, asphalt, or pavement to create a clean break at the edge of the demolition area. Sawcut LF prices separately from slab SF — the sawcut perimeter is a real labor and equipment cost that has nothing to do with the area inside it. Bids that forget to price sawcut LF underbid every partial-slab removal.
Scope Assembly
See: Circuit.
- See Circuit. "Scope assembly" is the more generic industry term; "circuit" is what Demotek calls them.
Selective Demolition
Surgical removal of specific building elements without taking the structure down.
- Selective demolition is interior gut, finish removal, partition demolition, and fixture salvage — the building stays standing, only the targeted elements come out. It prices labor-heavy (hand tools, small equipment, dust barriers) and produces a different disposal mix (mixed C&D debris) than structural demolition.
Shoring
Temporary structural support installed during demolition.
- Shoring is temporary support — posts, beams, falsework — installed to keep adjacent structure stable while a load-bearing element comes out. Shoring is always a structural-demolition concern and always its own line item with its own engineering scope. A structural removal that needs shoring but didn't price for it is a guaranteed money-loser.
Structural Demolition
Removal of load-bearing elements or a whole structure.
- Structural demolition removes walls that hold up floors, slabs, columns, foundations, or the entire building. It prices equipment-heavy (excavators, shears, pulverizers, sometimes cranes) and produces a disposal mix dominated by concrete, steel, and hardfill — usually with substantial salvage credits for scrap metal.
Takeoff
The act of measuring quantities from a plan set.
- A takeoff is the measurement step at the front of every demolition estimate. It answers "how much of what are we tearing out?" Modern on-screen takeoff replaces paper redlines and PDF markup with a digital plan viewer where you calibrate once and measure directly on the drawing. Quantities flow into the estimate without rekeying.
Tipping Fee
The per-ton or per-load charge a disposal site charges to accept debris.
- Tipping fee is what a disposal destination charges to take material. Landfill tipping is the highest; hardfill and recycler tipping are cheap or free; scrap yards pay you. The tipping fee plus the haul cycle time multiplied by the number of trucks is the total disposal cost. Both halves matter — cheap tipping with a long cycle still loses money.
TSI (Thermal System Insulation)
Asbestos insulation on pipes, ducts, and boilers — the classic friable linear scope.
- Thermal system insulation is the asbestos lagging on pipe runs, duct wrap, and boiler breeching. It is almost always friable and almost always the slowest, most expensive material to abate. TSI takes off as linear feet along the runs, but the fittings — counted separately as glovebag points — are what actually drive the labor.
Waste Manifest
The chain-of-custody document that tracks asbestos waste to a licensed disposal facility.
- Asbestos waste is a regulated stream: double-bagged or wrapped, labeled, and hauled to a licensed disposal facility under a manifest the generator signs. Disposal prices per unit — bags, cubic yards, or tons — at a licensed-facility tipping rate plus the haul. It is the same quantity-times-destination math as demolition disposal routing, but the endpoint is regulated and the manifest is mandatory.