AI Spec Review
AI that reads the spec book and pulls out the scope
A demolition bid hides in a few hundred pages: the demolition section, the abatement section, the summary of work, the alternates, the unit prices, the allowances and a hazardous-materials survey at the back. Demotek reads them for you and turns them into a scope list, each item citing the page and the words it came from.
Why scope gets missed
Nobody reads the whole spec book on a two-week bid. Estimators skim Division 02, search for "remove" and hope. The scope that costs money is somewhere else: an add alternate in the bid form, a unit price for extra ACM, an allowance in Division 01, a note on a sheet that puts the work "by others". A missed line is either money left out of the bid or a job you lose for carrying something you did not have to.
Reads what matters, skips what does not
The spec book is split into its sections. Demolition, abatement, summary of work, alternates, unit prices and allowances are read in full; other sections only where removal work is mentioned; finish specs with no removal language are skipped.
Every item cites its source
Each scope item carries the quote it was read from, the page, and the spot on the page. Click through to check it before it goes in the bid.
Base bid, alternates, allowances, unit prices
Items are sorted into the bid section the documents put them in, with labels like ALT-2 and UP-4 kept as written and add or deduct alternates told apart.
Exclusions and questions
Work the documents put outside your contract is listed as an exclusion, and anything the documents leave open is listed as a question to raise as an RFI before bid day.
Surveys and stated quantities
When a hazardous-materials survey states a quantity ("approximately 750 SF of 9x9 floor tile"), that quantity comes with the item, and the same material named in several places of the survey is kept as one line. Abatement work goes in as abatement, hazardous-material notes as flags.
Drawings too
Demolition notes on the sheets are read alongside the specs, so a keynote that says "remove existing ceiling" and the spec section that says how are both found, both cited, and tied to the same work.
Your estimator decides
The scan proposes; the estimator accepts, edits or deletes. Items you type yourself are never overwritten by a later scan, and a new addendum is read into the same list.
Frequently asked
Common questions.
What documents does it read?
Specification books, bid forms, addenda, hazardous-material survey reports and the drawing sheets uploaded to the project.
Do I have to start it?
No. The scan starts when the documents are uploaded and split, and can be run again by hand after an addendum.
Does it replace reading the specs?
It replaces reading them cold. You review a cited list of what the documents say instead of searching a few hundred pages, and every item links back to the page so you can read the part that matters.
Is it built for demolition?
Yes. It looks for removal, salvage, protection, coordination, hazardous-material and abatement work, the scope a demolition or abatement contractor prices, not the whole building.